The Anonymous Widower

Newport To London Electric Railway Is Completed

The title of this post, is the same as that of this article on the South Wales Argus.

This is the introductory couple of paragraphs.

Railway works to improve the line between Newport and London will allow for more frequent and quicker journeys, said to the boss of Network Rail.

Electrification works have now been completed on the Severn Tunnel, meaning the line from Cardiff and Newport to London Paddington is now fully electric.

The article also states that the Sudbrook pumping station, which pumps fourteen million gallons of water out of the Severn Tunnel every day is to be replaced.

The Severn Tunnel has been a project, which has involved lots of heroic engineering.

When I read articles like the one in the South Wales Argus, I am drawn back to the briefing I had from engineers at Sir Frederick Snow and Partners about their plan for a Severn Barrage, in the early 1970s.

It was a One-Design-Solves-Everything project and their plan, included a high speed railway and a motorway crossing between England and Wales.

 

June 7, 2020 - Posted by | Transport | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.