The Anonymous Widower

More Trains To Carmarthen

The last time, I looked at the number of GWR trains to Carmarthen its Wikipedia entry, it was just a couple.

Today, one train per hour (tph) is shown between London Paddington and Swansea, with this supplementary information.

  • 7 trains per day continue to Carmarthen, calling at Gowerton (limited), Llanelli, Pembrey & Burry Port, Kidwelly (limited) and Ferryside (limited)
  • On Summer Saturdays, 2 trains per day run to Pembroke Dock, calling at all stations between Carmarthen and Pembroke Dock

In Regulator Approves New Grand Union Train Service From Carmarthen To London Paddington, I talked about the plans of Grand Union Trains to run five trains per day (tpd) between London Paddington and Carmarthen.

This would appear to give a total of twelve tpd between London Paddington and Carmarthen.

This page on the Crown Estate web site is entitled Celtic Sea Floating Offshore Wind, where this is said.

The Government has set an ambition to deliver up to 5GW of floating wind by 2030, with rapid expansion anticipated thereafter.

At The Crown Estate, we are committed to helping the UK achieve its net zero ambitions. To support this, we are excited to deliver a new leasing opportunity in the Celtic Sea for the first generation of commercial-scale floating offshore windfarms – unlocking up to 4GW of new clean energy capacity by 2035, kick-starting industry in the region, and providing power to almost four million homes.

We will be inviting full commercial scale projects up to 1GW, which may be developed in a phased or ‘stepping stone’ approach. Recognising the need to develop the UK supply chain and supporting infrastructure for this nascent technology, this approach is deliberately intended to provide opportunities for growth and investment. This will also facilitate the co-ordination of the necessary infrastructure, such as ports and grid connections, all of which are key to the sustainable development of the UK floating wind sector over the long term.

This leasing opportunity will provide the foundation for greater capacity in the future and help establish an exciting new industrial sector for the UK, creating opportunities for significant new investment in jobs, skills and infrastructure for the communities onshore.

It appears to me, that Great Western Railway and Grand Union Trains both believe that there will be large increase in demand for rail travel between London Paddington and Carmarthen and also along the South Wales Coast.

Grand Union Trains are also proposing the building of a new parkway station at Parc Felindre North of Swansea.

But then this area of South Wales and the Celtic Sea, has the four things needed for the development of up to 5 GW of offshore wind; a lot of wind, a large area of empty sea, steel and deep water ports to assemble all the floating wind turbines.

A Zero-Carbon High Speed Railway Between London Paddington And Carmarthen

Consider.

  • The Great Western Railway between London Paddington and Carmarthen is 222.5 miles and trains take around three hours and fifty minutes, which is an average speed of 58 mph.
  • Between Bristol Parkway and Reading stations, the operating speed is 125 mph.
  • In South Wales, the operating speed is generally between 70 and 100 mph.
  • Only the 77.4 miles between Cardiff Central and Carmarthen via Swansea is not electrified.

There is probably scope to increase the operating speed using digital signalling and by improving the track.

I would suspect that a time between London Paddington and Carmarthen of under three-and-a-half hours is possible.

The Range Of Battery-Electric Trains

Hitachi have not been specific about the zero-carbon range of their Intercity Tri-Mode Battery Train, which is described in this Hitachi infographic.

In Stadler FLIRT Akku Battery Train Demonstrates 185km Range, I talk about Stadler’s record-braking Battery-electric; Akku, which covered 185 km or 115 miles.

I suspect that Hitachi’s engineers  and those at their battery suppliers; Turntide Technology will be ultra-competitive, so I wouldn’t be surprised that the zero-carbon range of the Hitachi train is very competitive to the Stadler FLIRT Akku.

A hundred mile range would allow electric services to be run on these routes.

  • Cardiff and Carmarthen – 77.4 miles
  • Chippenham and Bristol Temple Meads and return – 48.8 miles
  • Chippenham and Bristol Western-super-Mare and return – 86.9 miles
  • Swindon and Cheltenham Spa and return – 86.5 miles
  • East Coast Main Line and Hull and return – 72.2 miles
  • Plymouth and Penzance – 79.5 miles
  • Taunton and Newbury – 89.6 miles
  • York and Scarborough and return – 84.1 miles

I am fairly sure that Hitachi will aim for at least a hundred mile battery range for their Intercity Tri-Mode Battery Train.

  1. This would be competitive with other train manufacturers like Stadler and Siemens.
  2. They would handle a lot of important routes.
  3. With development they could probably handle Edinburgh and Inverness.

I can’t wait to have a ride.

June 8, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , | 2 Comments

So Many Floating Wind Designs, So Few Test Sites – Norwegian METCentre Sold Out

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

There are currently more than 80 floating wind technology concepts and designs worldwide, and testing even a certain number of these could prove to be an endeavour since there are not many test sites dedicated to floating wind technology in Europe.

It strikes me that we need more test centres.

As UK waters will in the next couple of decades be home to a lot more GW of wind farms, perhaps we should develop a test centre.

I wonder, if South Wales would be the place for a test centre.

  • There is a lot of sea, which isn’t cluttered with oil and gas rigs, and wind farms.
  • There are a lot of wind farms planned in the area.
  • There are at least two good technology universities.
  • There are some deep water ports.
  • Electricity connections and power generation are good.
  • There is good train connections to the rest of England and Wales.
  • A train testing centre is being built at Nant Helen. Some tests needed to be done could be the same.

Some innovative designs for wind turbines are also being developed in South Wales.

 

 

February 7, 2023 Posted by | Energy | , , , , , , , , , | 3 Comments

UK And Welsh Governments To Explore New Rail Links Between South Wales And England

The title of this post, is the same as that of this press release from the UK Government.

These are the three bullet points.

  • UK and Welsh governments today (2 February 2023) announce a new study to improve transport connectivity between south-east Wales and west of England
  • the study, backed by £2.7 million of UK government funding, will look at options for new railway stations and rail services on the South Wales Main Line
  • this project will focus on relieving congestion on the M4, a vital connector between south Wales and the rest of the UK

The stations are not named, but it is said that they could be between Cardiff and the Severn Tunnel.

The last paragraph changes direction a bit.

Lord Peter Hendy also proposed reviewing the route connecting north Wales to the north-west of England, better connectivity with HS2 and a package of railway improvements to increase connectivity and reduce journey times between Cardiff, Birmingham and beyond.

I find this development very interesting, but typical of the sensible approach one would expect from Lord Peter.

In Could High Speed Two Serve Holyhead?, I looked at the route and came to this conclusion.

London Euston and Holyhead could be a serious proposition.

With some development and a new fast ferry, it could also open up a practical zero-carbon route between Great Britain and Ireland.

Times of four and a half hours between London Euston and Dublin could be possible.

I suspect that time would appeal to green tourists, especially those in First with a good meal.

February 3, 2023 Posted by | Transport/Travel | , , , , , , , , , , , | 4 Comments

Will It Be Third-Time Lucky For Grand Union Trains In Wales?

It is three years since I wrote Grand Union Seeks ’91s’ To Cardiff and their proposal has not been accepted and the third iteration has been announced.

This article on Wales Online is entitled Independent Rail Firm Bids To Launch As Rival To Great Western On The Mainline From South Wales To London.

These are the introductory paragraphs.

An independent rail firm is hoping to launch a rival train service in Wales which they say will slash journey times between Carmarthen and London. Grand Union Trains is making a fresh bid to introduce an initial service in both directions between Cardiff and London on the existing Great Western line.

The company believes the move will “create passenger choice” and increase the number of trains available, with the hope that the service can be extended west in South Wales towards Carmarthen.

Other points in the article include.

  • Swansea will be by-passed, which will speed up services to and from Llanelli and Carmarthen.
  • A new Park-and-Ride station will be built by Grand Union at Felindre, which is to the North of Swansea.
  • Services will stop at Llanelli, Cardiff Central, Newport, Severn Tunnel Junction and Bristol Parkway.
  • When Cardiff Parkway opens, this will be an extra stop.

An article in the June 2022 Edition of Modern Railways, which is entitled Grand Union Bids For London To Carmarthen, gives extra details.

  • Three classes.
  • 2023 start for the service.
  • Five return trains per day.
  • Cycle provision.
  • Vanload freight will be carried.
  • Electric trains could start between London and Cardiff by 2023.
  • In 2025, trains could be nine-car bi-modes.
  • South Wales-based operation and maintenance.
  • 125 full-time jobs created.

It certainly seems to be a comprehensive and well-thought out plan.

These are my thoughts and observations.

Felindre Station

Felindre station is named in Wikipedia as the West Wales Parkway station, where it is introduced like this.

West Wales Parkway is a proposed railway station north of Swansea, near to the boundaries of the neighbouring principal area of Carmarthenshire, and the villages of Felindre and Llangyfelach. The station is proposed to be situated at the former Felindre steelworks, near Junction 46 of the M4 and A48, and near Felindre Business Park and Penllergaer Business Park. The project is in the planning stages, as part of a wider Department for Transport proposal to re-open the Swansea District line to passenger traffic.

This Google Map shows where, it appears the Felindre station will be built.

Note.

  1. The Felindre Business Park in the North-West corner of the map, with a Park-and-Ride.
  2. The M4 running across the bottom of the map.
  3. The Swansea District Line runs East-West between the motorway and the Business Park.

It looks that the new station could be located on the South side of the Business Park.

According to Wikipedia, the station would cost £20 million to build.

  • It would need a comprehensive rethinking of transport improvements in the Swansea area.
  • But it could result in time savings on services between Carmarthen and Cardiff.

The Modern Railways article says this.

GU proposes to build the Felindre station near Swansea and invest in Severn Tunnel Junction station, where it says it will increase parking, provide direct access from the M4 motorway and improve passenger and staff facilities, backing up plans being evaluated by the Welsh Government for the station.

Grand Union is not a charity and does this indicate that a bank or infrastructure company is prepared to fund parking and the extra passengers pay the charges.

Rolling Stock

Wikipedia says that the rolling stock could be nine-car InterCity 225s hauled by Class 91 or Class 93 locomotives.

As the Class 93 locomotives are bi-modes, these would handle the Carmarthen and Cardiff leg.

The Modern Railways article says this.

Trains could start between Cardiff and London Paddington as early as May 2023 if electric only, with services extended west around two years later with new bi-mode trains in up to nine-car formations.

Would a new Class 93 locomotive count as a new bi-mode train?

I suspect the new locomotive would be more affordable, than a new bi-mode train.

Vanload Freight

This is an interesting idea and it follows similar thinking to Royal Mail’s latest ideas, that I wrote about in Royal Mail Rolling Back The Years To Put More Post On Trains.

One coach could be a nice little earner, if it were modified to carry roller cages, that were loaded and unloaded at the end of the route.

One advantage of the InterCity 225s is that they are 125 mph trains, so that this will be high speed freight.

Timings

Consider.

  • A GWR Carmarthen and London service takes three hours and 47 minutes.
  • This includes a nine-minute reverse at Swansea.
  • GWR makes seven more stops than Grand Union will.
  • GWR does seven diesel stops, whereas Grand Union will only do two.

I would estimate that Grand Union will be under three hours and thirty minutes.

Carmarthen Station

This Google Map shows Carmarthen station.

Note.

  1. The station has two platforms.
  2. There are certainly pictures of the station with an InterCity 125 in the station.

These pictures show the station.

I suspect that the station will be upgraded to accommodate Grand Union.

Rrenewable Energy Developments In South West Wales

In Enter The Dragon, I talked about renewable energy developments in South West Wales.

I used information from this article on the Engineer, which is entitled Unlocking The Renewables Potential Of The Celtic Sea.

The article on the Engineer finishes with this conclusion.

For now, Wales may be lagging slightly behind its Celtic cousin to the north, but if the true potential of the Celtic Sea can be unleashed – FLOW, tidal stream, lagoon and wave – it looks set to play an even more prominent role in the net zero pursuit.

The Red Dragon is entering the battle to replace Vlad the Mad’s tainted energy.

South West Wales could see a massive renewable energy boom.

The Railways To The West Of Carmarthen

This map from OpenRailwayMap shows the rail lines to the West of Carmarthen.

There are three main branches to Fishguard, Milford Haven and Pembroke Dock.

I can see the railways becoming increasingly important in supporting the growing renewable energy in the area.

  • There would be more frequent services.
  • Services would tie in with London and Cardiff trains at Carmarthen.
  • Closed stations could be reopened and new ones built.

It may also be possible to bring in large components needed by the renewable energy industry.

Conclusion

I feel that Grand Union have seen the opportunities presented to a frequent Carmarthen and London service and have grabbed them with both hands.

May 29, 2022 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | 3 Comments