I was in Eastbourne today, so I went and had a look at the level crossing at Hampden Park station.

To make sense of the pictures, this is a Google Map of the station.

You can even see cars waiting by the crossing. In various places on the web it is described as one of the busiest in Europe.

As someone who is very capable at solving mathematical puzzles, which is probably why I was good at writing resource scheduling algorithms, I tend to look at this level crossing as an extreme multi-variable problem.

  • The railway objective is to get up to fourteen trains per hour (tph) through the crossing and the station with perhaps six trains stopping at the station.
  • The road objective is to keep the traffic flowing smoothly.
  • From web reports mentioning the crossing, the natives are getting restless.

It does strike me, that something must be done to reduce both road and rail traffic through the crossing.

Remote Control Of The Level Crossing

One thing that was done in February 2015 was to close the signal box at the station and move control of the crossing to the Three Bridges Regional Operations Centre.

Hopefully with time, this will result in trains going into Eastbourne passing trains coming out at the level crossing, thus reducing the number of level crossing closures.

Reducing Road Traffic

This is a Google Map of the area around the station and the level crossing.

Note how the A2280 road goes from one side of the crossing to the other in a wide semi-circle to the South.

  • Is the signage good enough to encourage drivers to use the A2280?
  • Does the A2280 have enough capacity?
  • Are any classes of vehicles banned from using the  crossing?
  • Does level crossing traffic increase when children are going to and from school?
  • Are there any cycleways?

As I was on foot and don’t live nearby, I wouldn’t know the answers to these questions.

A Turn Up And Go Service Between Hampden Park And Eastbourne

On the Birmingham, Liverpool and London principle of what constitutes a Turn-Up-And-Go service, there should be four tph in both directions on a route.

So there needs to be at least four tph in both directions that stop at both Hampden Park and Eastbourne.

Tickets To And From Eastbourne

If you buy a ticket to Liverpool, it allows you to go to any the city’s central stations.

I would also make Hampden Park an Eastbourne station, so that a ticket to Eastbourne was valid to both Eastbourne and Hapden Park stations.

Tickets Between Hampden Park And Eastbourne

I’d make this free to all those in the following categories.

  • Those having a ticket to or from Eastbourne stations.
  • Disabled passengers.
  • People who had paid something like a tenner for a yearly pass.

Yearly passes would be available for all those, who lived or worked in the area.

All monies raised on the yearly passes would go to an appropriate local charity.

Would making the short journey free, mean that many living near Hampden Park station used the train to go to Easstbourne? And would this reduce traffic on the level crossing?

A Step-Free Bridge At Hampden Park Station

What would be the effects of putting a step-free bridge with lifts, that could be used by rail passengers and those wanting to cross the rail line, when the crossing is closed?

Reducing Rail Traffic

I believe that by controlling the trains on a one-in one-out basis as I described earlier, that a few closures an hour could be avoided.

But more closures could be eliminated if the chord was reinstated that allowed trains to by-pass Eastbourne.

This Google Map shows the area North of Hampden Park station.

Three stations are shown on the map.

A triangle of rail lines or their former locations can be picked out between the station.

Note too how the A22 road passes up to the East of Hampden Park to join the A27.

This road also crosses the former track of the East Coastway Line just South of the A27 in open country.

Would it be a sensible idea to build an |Eastbourne Parkway station at this location?

Using the by-pass and stopping at Eastbourne Parkway station would have the following effects.

  • A few minutes journey time would be saved.
  • There would be two less closures of the Hampden Park level crossing.
  • Passengers from Eastbourne wanting to catch a train to the West would change at Polegate station.
  • Passengers from Eastbourne wanting to catch a train to the Wast would change at Pevensey Bay station.

I’m certain, that a good scheme can be devised, that probably would make all changes of train, ones where passengers didn’t need to change platforms.

Conclusion

I think that the number of closures of the Hampden Park level crossing could be reduced to perhaps four or five an hour, where one train went in to Eastbourne and aother came out.

I also think that drivers can be nudged, so that they don’t travel across the level crossing so often.

May 26, 2017 - Posted by | Travel | , ,

2 Comments »

  1. Does a dive under seem plausible?

    Comment by matbest | May 26, 2017 | Reply

  2. I think that for several million pounds you might be able to lower the railway as the site is wide, but it would be a major undertaking that woiuld mean closing the line to Eastbourne for a few months.

    I think that by controlling the trains and the level crossing from Three Bridges they might be able to cut the number of level crossing closures.

    Do myou have any answers to my questions about traffic?

    Comment by AnonW | May 26, 2017 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s