Australian Coal Mine To Transform Into Pumped Hydro Facility
The title of this post, is the same as that of this article on PV Magazine.
This is the introductory paragraph.
Australian utility AGL is transforming its operations in a number of ways, from restructuring the company itself, to building energy storage facilities for flexible distribution of renewable energy into the future. The company is also planning to build a pumped-hydro facility at a disused open-cut coal mining site in eastern Australia.
It is an interesting proposition to say the least to reuse an opencast coal mine for something useful.
It would appear to be able to supple 250 MW for eight hours, which would make it a 2 GWh facility.
But then Australia is a country, that needs a lot of energy storage as they transform their economy to zero carbon.
No comments yet.
Leave a Reply