Adding Glossop/Hadfield And Manchester Piccadilly To The Bee Network
This article on the Railway Gazette has a list of the lines, that will be transferred between Northern Rail and the Bee Network.
Included in the list is this line.
Glossop/Hadfield And Manchester Piccadilly
I think this route would be the following.
- The Eastern termini would be Glossop and Hadfield.
- The Western terminus would be Manchester Piccadilly.
- Intermediate stations would be Dinting, Broadbottom, Hattersley, Godley, Newton for Hyde, Flowery Field, Guide Bridge and Ashburys.
- The route is fully electrified with 25 KVAC overhead.
- Most of the route has a range of operating speeds. up to 75 mph.
- The distance is 14.8 miles
- Trains take 41 minutes
- Trains are often three-car Class 323 trains.
The route is the same as the current Northern Trains service.
This is my thought.
Trains
The Class 323 trains could be easily replaced with a 25 KVAC overhead version of Merseyrail’s Class 777 trains.
[…] Glossop – Hadfield – Manchester Piccadilly […]
Pingback by Manchester Buzzing To Put Rail Into Its Bee Network « The Anonymous Widower | March 31, 2023 |
Derbyshire already has a arrangement with TfGM to operate in what is described as the “High Peak” area, so this one could run.
Comment by R. Mark Clayton | April 1, 2023 |