The Anonymous Widower

West Hampstead Station – 7th July 2018

The new bridge at the West Hampstead station is now in use and it looks like the new station will be completed by the end of the year.

As the last picture shows this could be one of those station developments, where a deck could have been built over the North London Line to increase the number of flats built in the development on the South side of the railway.

This Google Map shows West Hampstead station on the North London Line and West Hampstead tube station on the Jubilee and Metropolitan Lines, although the latter don’t stop.

Note the development stretches a long way to the West between the North London Line and Underground Lines.

There have been plans to create a West Hampstead Interchange on West End Lane.

As these envisaged moving the Overground station to the East side of West End Lane and the new station is being built on the West side, It would appear there’s been a rethink.

Perhaps the Underground station is to be moved to the West side of West End Lane and will have an entrance on the small square in front of the M & S Simply Food and alongside the new Overground station.

This Google Map shows an enlargement of the area.

The new station could have platforms on the following lines.

  • Jubilee Line
  • Metropolitan Line
  • Cjhiltern Railway

It would be a very worthwhile interchange. Especially, as passengers could do the following.

  • Walk across the square for the Overground for East London.
  • Walk perhaps another hundred metres to West Hampstead Thameslink station, which is also proposed as the terminus of the West London Orbital Railway.

There could also be a development on the top of the new station, which would hopefully contribute to the cost.

I have no idea, if anything will happen here, but Transport for London are looking to create new stations with over-site development. The Mayor also seems keen on the West London Orbital Railway, as it is based on under-used infrastructure and requires no new track or tunnels.

 

 

July 7, 2018 Posted by | Transport | , , , , , , , , | Leave a comment

Getlink Pushes Budget Train Service Between London And Paris To Rival Eurostar

The title of this post is the same as that of this article on I-News.

Getlink is the infrastructure company, who actually own the tunnel and they have commissioned research into the idea, as this paragraph indicates.

Currently, Eurostar trips take around 2.2o hours and depart from St Pancras. The new link between Stratford and Paris would take just over three hours, but 25-30 per cent lower operating costs would mean lower fares for passengers. The numbers come from consultancy firm Roland Berger, and was commissioned by Getlink.

Elsewhere, the article says that the service will go to Roissy, which would be convenient for Charles de Gaulle Airport.

I do wonder, if someone has their eye on a couple of Eurostar’s retired Class 373 trains.

In 2011, I posted  about an idea for a Trans Manche Metro.

 

July 7, 2018 Posted by | Transport | , , , , | Leave a comment