The Anonymous Widower

Will Abellio East Midlands Railway Go Flirting?

Abellio take over the East Midlands franchise in a few days and it will be renamed to East Midlands Railway.

It has already disclosed that it will have three divisions.

  • EMR Intercity for long distance services from London St Pancras
  • EMR Regional for local services
  • EMR Electrics for the London St Pancras to Corby service

It has also confirmed it has ordered thirty-three AT-300 trains for EMR Intercity.

Wikipedia also shows, that the following trains will be transferred to East Midlands Railway.

The first three fleets will come from Abellio-run franchises and the last will be released fairly soon, as Hull Trains new fleet is arriving.

Looking at the EMR Regional fleet it will comprise.

Consider.

  • Many probably feel that the Class 153 trains are inadequate.
  • Except for the Class 170 trains, these trains are around thirty years old.
  • Some of the Class 156 trains, which will be transferred from Greater Anglia, are currently being replaced with brand-new Class 755 trains.
  • Abellio are going through extensive fleet replacement exercises in ScotRail, Greater Anglia and West Midlands Trains.

The EMR Regional routes, that they will run are a mixed bunch.

This page on the Department for Transport web site is an interactive map of the Abellio’s promises for East Midlands Railway.

Digging out the blurb for each route shows the following.

Norwich – Nottingham – Derby

Crewe – Derby – Nottingham

Matlock – Derby – Nottingham

Nottingham – Lincoln – Grimsby

Nottingham – Worksop

Nottingham – Skegness

Leicester – Nottingham

Peterborough – Lincoln – Doncaster

Barton-On-Humber – Cleethorpes

Lincoln – London

London – Oakham – Melton Mowbray

London- Leeds – York

 

Newark North Gate – Lincoln

I have come to a few conclusions.

The Fleet Is Not Being Expanded Enough To Retire The Class 153 Trains

Consider.

  • There are twenty-one Class 153 trains.
  • Five Class 170 trains and nine Class 156 trains are being added to the fleet.

Surely, this means that some Class 153 trains will be retained.

Perhaps, the remaining Class 153  trains, will be reorganised into two-car trains to increase capacity.

Extended Services Will Be Run Using New Bi-Mode AT-300 Trains

Services to Leeds and York, Oakham and Melton Mowbray and Lincoln would appear to be run by the new AT-300 trains that have been ordeed from Hitachi.

I’ve no problem with that,but there are three developments that may effect passenger numbers.

  • There is a lot of housing development in the Corby, Oakham and Melton Mowbray area.
  • There is a very large renewable energy sector developing in North Lincolnshire.
  • Sheffield are proposing to add new stations between Sheffield and Leeds, at Rotherham and Barnsley Dearne Valley.

Does the proposed service pattern take this fully into account?

In a way it doesn’t matter, as the worst that could happen, is that East Midlands Railway will need to increase the fleet size by a small number of trains.

Hopefully, they’ll just need to get Hitachi to build the trains!

Most Regional Services Will Be Run By Refurbished Modern Trains

Most services will be run by refurbished modern trains with the following features.

  • More reliable service
  • Improved comfort
  • Passenger information system
  • Free on-board wi-fi
  • At-seat power sockets
  • USB points
  • Air-conditioning
  • Tables at all seats
  • Increased luggage space

Can East Midlands Railway Refurbish Their Augmented Fleet To Meet Their Required Standards?

Consider.

  • The Class 170 trains are relatively recent and were built to a high standard, so can probably meet EMR’s standard.
  • The Class 158 trains are thirty years old and were built to a high standard, so they might be able to be upgraded to EMR’s standard.
  • The Class 156 trains are thirty years old and noisy and old-fashioned, so will need a lot of work to bring them up to EMR’s standard.
  • The Class 153 trains are thirty years old and only one car, so would probably be best retired or reduced to an auxiliary role like a bicycle car.
  • Only the Class 170 and Class 158 trains can be high standard trains.
  • All trains are diesel and only the Class 170 trains are possibly planned to be upgraded to more economical diesel hybrid trains

One additional option might be to refurbish some of the Class 222 trains, when they are replaced by the new Hitachi AT-300 trains on main line services, so they were suitable for the longer regional routes.

Will East Midlands Railway Replace The Fleet?

In their three other franchises in the UK; Greater Anglia, ScotRail and West Midlands Trains, Abellio have opted for replacement of all or a substantial part of the fleet.

So will the same action be taken at East Midlands Railway?

The company could do a lot worse, than invest in a fleet of Class 755 trains like Greater Anglia.

  • They could be a mix of lengths, so each route could have a train with capacity for the traffic.
  • The trains may be capable of 125 mph running on the Midland Main Line and the East Coast Main Line.
  • The interiors meet the company’s requirements.
  • The trains could use electrification , where it exists.
  • The trains could be fast enough to cover for the AT-300 trains.
  • Abellio Greater Anglia will soon have a large knowledge base for the trains.

The clincher could be, that as electrification increases, the trains could fit batteries and generate less carbon.

Conclusion

I wouldn’t be surprised to see Abellio East Midlands Railway buy a fleet of Class 755 trains for their EMR Regional services.

 

 

 

 

 

 

 

August 7, 2019 - Posted by | Transport | , , , , , , , ,

4 Comments »

  1. So no through trains Manchester Norwich and stations beyond Nottingham. A disbenefit IMO, and means I want to go and visit my sister in Lincolnshire I will now probably drive.

    Comment by R. Mark Clayton | August 7, 2019 | Reply

    • I’ve used the service at times and it needs four cars at the Liverpool end and two from Peterborough to Norwich. I think it is a nightmare to get right. It’s being split into Liverpool and Nottingham, and Derby and Norwich. They’re also increasing Nottingham and Lincoln services and joining up Doncaster and Peterborough via Lincoln as one service. I think they’ve been looking at passenger loadings and they’re making better use of the Joint Line. I wouldn’t be surprised to see Abellio pushing for the reopening of March and Spalding, which will enable an all-Abellio London Cambridge Lincoln Doncaster service. A lot of the locals are against it, as it will allow freight trains to cut the corner and avoid the ECML and the freight trains clog the level crossings as it is! But Cambridge wants the link, as it would create a rail line to bring in commuters from Wisbech, Spalding, Sleaford and Lincoln.

      Comment by AnonW | August 7, 2019 | Reply

  2. Why don’t Abellio start testing a Class 385 battery car on EMR’s rural lines?

    Comment by Yy Hiro | August 11, 2019 | Reply

    • To charge the battery, you need either electrified lines or charging stations. EMR’s rural lines have neither, but ScotRail has a lot of convenient electrification and they are the franchise. So they can do all the testing they want as soon as the train is built!

      With EMR they will have to do the testing elsewhere.

      They don’t need class 385 trains in Greater Anglia as they have bi-modes that can be converted to battery-electric.

      Comment by AnonW | August 12, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.