The Anonymous Widower

East Coast Main Line Northern Power Supply Works Funded

The title of this post, is the same as that of this article on Railway Gazette.

This is the introductory paragraph.

As part of its £1·2bn East Coast Upgrade programme, Network Rail has awarded a £216·2m contract to the Rail Electrification Alliance for the long-awaited strengthening of the 25 kV 50 Hz traction power supplies on the northern section of the East Coast Main Line between Doncaster and Edinburgh.

It is much-needed. if the planned extra electric services are to be run on the route.

These could include.

  • East Coast Train‘s new London and Edinburgh service.
  • Extra TransPennine Express services and some services converting from diesel traction.
  • Extra LNER services to Middlesbrough and other destinations.
  • Conversion of Grand Central services to electric or bi-mode traction.

Will Freightliner use some of its new fleet of thirteen Class 90 locomotives on the route?

Will News Of The Upgrade Bring Forth Train And Locomotive Orders?

I wonder if this could happen.

Freight operators need to decarbonise, but surely there’s a bit of a chicken-and-egg situation on the East Coast Main Line, as there’s no point in ordering electric locomotives for the route, until you have a date, from when they can be used.

Conclusion

This upgrade will have some very good xonsequences.

September 21, 2020 - Posted by | Energy, Transport | , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.