The Anonymous Widower

Stone Crossing Station – June 27th 2022

I changed trains yesterday at Stone Crossing station and took these pictures.

Note.

  1. It is a basic station with two long platforms.
  2. There is a bridge at one end.
  3. More houses are being built nearby, behind the trees.

It needs upgrading to the Twentieth Century.

A Second Visit To Stone Crossing Station

As I wanted to look at the footbridge, I went back again today.

This looks very much like an interim design to get passengers and pedestrians across the line safety.

A Crossrail To Ebbsfleet Station

This station will need to be made step-free, if Crossrail is extended to Ebbsfleet station.

The station will be handling ten trains per hour (tph) in both directions.

 

 

June 28, 2022 - Posted by | Transport/Travel | , , , ,

1 Comment »

  1. […] More details of Stone Crossing station are given in Stone Crossing Station – June 27th 2022. […]

    Pingback by Elizabeth Line To Ebbsfleet Extension Could Cost £3.2 Billion « The Anonymous Widower | June 28, 2022 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: