The Anonymous Widower

Prysmian Completes HVDC Submarine Cable Testing

The title of this post, is the same as that of this article on renews.biz.

The article has this sub-heading.

The ‘first’ 525kV extruded wire can increase maximum transmission capacity up to more than 2.5GW.

This paragraph gives the implications of this new maximum transmission capacity.

This will enable a massive increase of the maximum transmission capacity of bi-pole systems up to more than 2.5GW, which is more than double the value achieved with 320kV DC systems currently in service, Prysmian said.

As in the future we will have many more large offshore wind farms in the UK, this surely must mean that we will find connecting them up a lot easier.

August 26, 2022 - Posted by | Energy | , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: