ZERRCI – Zero Emissions Repowering Of Railway Construction Infrastructure
This project was one of the winners in the First Of A Kind 2022 competition run by Innovate UK.
In this document, this is said about the project.
Project No: 10037562
Project title: ZERRCI – Zero Emissions Repowering Of Railway Construction Infrastructure
Lead organisation: EMINOX LIMITED
Project grant: £59,852
Public description: Eminox, HS2 and SCS Railways propose a solution for the delivery of a low emissions, greener
railway. Our solution covers the development of an electric motor and battery system, which can be
retrofitted into existing construction equipment, replacing the traditional diesel engine with a quieter,
cleaner, zero emissions drivetrain. These pieces of plant and equipment will be used as direct
replacements for diesel machines in the constructing and maintaining railway infrastructure.
Eminox is leading this project with its experience in providing cost effective retrofit emissions
solutions and together with HS2 and SCS JV will be involved in demonstrating the first repowered
construction equipment in a real-world rail infrastructure environment.
This proposed venture has been instigated by HS2 in line with their ambition as set out in their Net
Zero Carbon plan for diesel free construction sites by 2029. As the solution will extend the life
expectancy of the machine, it will contribute to HS2’s vision of net-zero by 2035.
This solution will offer a more cost-effective route to zero emissions construction compared to
purchasing similar new electric powered equipment by extending the life expectancy of existing
plant and machinery. With a target of 50% the price of purchasing new excavators it is expected to
incentivise the broader uptake of demand in electric plant and equipment at scale across the
industry supply chain.
Phase 1 of this project aims to deliver a proposal for a prototype zero-emissions excavator. By
performing a feasibility study on the conversion principals, we intend to extract a broad
understanding of the challenges associated with integration and develop an optimised battery and
motor system specification.
Phase 2 will involve the conversion, commissioning and delivery of a repowered excavator, and
subsequent in-service validation. By using this converted machine to conduct initial trials, it will be
proven that no machine functionality or safety features have been compromised during conversion,
and we will establish power storage requirements to provide adequate duty cycle performance.
This will result in a fully proven demonstrator with real-world validation enabling further
development of optimised battery solutions.
My Thoughts And Conclusion
[…] 10037562 – ZERRCI – Zero Emissions Repowering Of Railway Construction Infrastructure […]
Pingback by First Of A Kind 2022 Winners Announced « The Anonymous Widower | November 20, 2022 |