The Anonymous Widower

I Travel On The East-West Rail – 28th November 2026

Today, I took a train between London Euston and Swindon and after a coffee, I retraced my route.

I will ask Google AI some questions about my journey.

Were Today’s GWR Services The First Between London Euston And Swansea Stations?

Google AI gave this answer.

No, today’s (Saturday, November 28, 2026) Great Western Railway (GWR) services between London Euston and Swansea were not the first.
GWR already ran passenger diversions between London Euston and Swansea during earlier engineering closures—including on Sunday, November 17, 2024. Today’s trains are part of a new wave of diversions tied to Old Oak Common works and a closure of London Paddington, running non-stop between London Euston and Swindon before continuing via Bristol Parkway to Swansea or Carmarthen. You can check current engineering arrangements on Great Western Railway Planned Engineering or read coverage in BBC News.

Pity, as I would have liked to be on the first day.

What Is The Line Speed Between Bicester Village And Bletchley Stations?

Google AI gave this answer.

The maximum line speed on the rebuilt East West Rail section between Bicester Village and Bletchley is 100 mph (160 km/h).

This map is from OpenRailwayMap.

Note.

  1. Bicester Village station is marked by the blue arrow.
  2. Bletchley station is in the North-East corner of the map.
  3. The track between the two stations is marked three times as 100 mph.

Undoubtedly, the route is designed for 100 mph running.

My train going to Swindon averaged 48 mph. But coming back it averaged 98 mph.

Could A Class 802 Train With Batteries Run On Battery Power Between Milton Keynes Central And Oxford Stations?

Google AI gave this answer.

Yes, in theory—at least on paper—a battery-fitted Class 802 could cover the distance between Milton Keynes Central and Oxford on battery power alone.

Hitachi’s trial Class 802 achieved a battery-only range of around 43–44 miles (70 km), while the rail distance between Milton Keynes Central and Oxford is roughly 29–40 miles depending on the exact route.

Using Real Time Trains, I have calculated that the distance between Milton Keynes Central and Oxford stations is 34.5 miles.

Trains could be charged at Milton Keynes Central station, but not at Oxford.

Could A Class 802 Train With Batteries Run On Battery Power Between Milton Keynes Central Station And Foxhall Junction?

Note that Foxhall junction is where trains running between Oxford and Swindon stations pick up the electric power again.

Google AI gave this answer to my question.

Potentially yes in terms of battery range, though there isn’t a direct passenger rail line between Milton Keynes Central and Foxhall Junction.

In UK trials, a battery-retrofitted five-car Class 802 achieved around 43–45 miles (about 70 km) of running on battery power alone. Straight-line/crow-flies distance between Milton Keynes and Didcot (where Foxhall Junction sits just west of Didcot Parkway) is roughly 35–36 miles (57–59 km), while real-world rail routing via London or cross-country corridors is substantially longer.

Using Real Time Trains, I have calculated that the distance between Milton Keynes Central station and Foxhall junction is 44.7 miles.

My Thoughts On The Range of Class 800 Trains

In What Will Be The Range Of A Hitachi Class 800 Battery Train?, I argued that initial versions of Hitachi battery-electric trains, will have a range of 93.7 miles, so that the LNER can handle the Great Northern and Great Eastern Joint Line diversion on battery power.

What Operating Speed Is Needed For The Trains Of The East-West Railway?

Consider.

  • Judging by the 98 mph averagespeed of my train yesterday between Bicester Village and Bletchley, I believe a train operating speed of at least 100 mph is needed.
  • Electric trains like Class 387 trains, that mix it with 125 mph expresses have an operating speed of 110 mph.
  • The faster services between Oxford and Cambridge run, the more they will attract passengers.
  • It is likely, that East-West Rail will be carrying freight trains, which will be slower.
  • But then there are rumours of faster freight trains.

I must admit, that for compatibility purposes, I would prefer running 5-car 125 mph Hitachi trains with batteries, like the Class 820 trains being built for Grand Central Trains.

Charging Of Trains On East-West Rail

Charging of trains on East-West Rail could be performed at the following places.

  • Bedford station, which is fully-wired. Even the Marston Vale platform is wired.
  • Milton Keynes station, which is fully-wired.

But there is no wires for charging at the Oxford end.

I think there are three possible solutions, to running 100 mph plus battery-electric trains on East-West Rail.

  1. The two North-facing bay platforms, that are numbered 1 and 2, at Oxford are wired.
  2. The East-West Rail services terminate at Reading.
  3. The East-West Rail services run back-to-back with GWR’s Oxford and Bristol Temple Meads service to create a comprehensive East-West Rail.

All solutions would have their advantages and disadvantages.

Wiring Platforms 1 And 2 At Oxford Station

These pictures and text are copied from Reading And Oxford – 10th June 2023.

These pictures show the two North facing bay platforms 1 and 2 at Oxford station.

Note.

  1. The platforms are not electrified.
  2. They appear to be easily updated with electrification to be able to charge Chiltern and East-West Rail trains.
  3. Marylebone is only 66.7 miles from Oxford.
  4. Milton Keynes Central is just over 40 miles from Oxford.
  5. Bedford is just under 60 miles from Oxford.
  6. The platforms would take most current five-car trains.

I suspect that services from Oxford to Bedford, Marylebone and Milton Keynes can all be run by battery-electric trains.

Electrification of these platforms, would be ideal for trains terminating at Oxford station and needing charging.

But it has been suggested that some Chiltern services to Oxford would extend along the Cowley Branch. In that case charging would be needed on the branch.

Also, it has been suggested, that some East-West Rail services will go on to Reading. These trains would charge on the Great Western Main Line.

But depending on the cost of electrifying the two platform, it would probably be prudent to electrify them, to cater for all eventualities.

East-West Rail Terminates At Reading

I estimate that it is about 46 miles between Milton Keynes and the electrification of the Great Western Main Line at Didcot Parkway station, so there should be no problems running between Reading and Milton Keynes stations, with charging at both ends of the route.

But as not all East-West Rail trains will want to go to Reading, it will stillbe necesary to wire platforms 1 and 2 at Oxford station.

East-West Rail Terminates At Bristol Temple Meads

Consider.

  • Oxford and Milton Keynes and Great Western Railway’s Oxford and Bristol Temple Meads service would be replaced with a two trains per hour (tph) , between Milton Keynes and Bristol Temple Meads.
  • It is about 45 miles between Milton Keynes and Foxhall junction, where the service would join the Great Western Main Line.
  • Trains take just under thirty minutes to travel the forty miles between Chippenham station and Foxhall junction, which is more than enough time to fully charge the batteries.
  • Chippenham station is only 24.4 miles from Bristol Temple Meads station or a round trip of 48.8 miles.
  • Great Western Railway already use 5-car Class 802 trains on their Oxford and Bristol Temple Meads service.
  • Milton Keynes has rail connections to Birmingham, Liverpool and Manchester, and a Lumo to Stirling.
  • I estimate that Milton Keynes and Bristol Temple Meads would take around two hours.

I believe a Hitachi Intercity Express Train would be ideal to run a two tph service between Milton Keynes and Bristol Temple Meads.

The train would need.

  • A battery range of at least 50 miles.
  • The ability to run at 125 mph.
  • Five cars.

This service could form an initial East-West Rail service, which would need no new infrastructure and perhaps just a few extra five-car Class 802 trains.

Expanding The Initial Service

Everything to the East of Bletchley seems to be fraught with difficulties.

There have been arguments over the depots, route, stations and whether a motorway would be better.

Would A Motorway Be Better Between Cambridge And Milton Keynes?

Some would argue this, but let’s see what Google AI thinks.

I received this response.

A full motorway isn’t currently planned between Cambridge and Milton Keynes, though a major £1 billion+ dual-carriageway upgrade on the A428 (Black Cat to Caxton Gibbet) is underway and slated to open in 2027 to smooth out the bottleneck between the two cities.

Why a motorway could help

Faster, steadier flow: Right now, driving the ~48-mile route via the A428 and A421 takes roughly 1 hour 20 minutes in typical traffic, with bottlenecks slowing things down.

Linking major corridors: A high-speed link between the M1 near Milton Keynes and the M11/A14 around Cambridge would connect growing tech, academic, and logistics hubs more directly.

Less rat-running: Better strategic road capacity can pull longer-distance and freight traffic off local roads and villages along the corridor.

Why a full motorway faces pushback

High cost vs. return: Earlier plans for a broader Oxford–Cambridge expressway were scrapped after assessments found costs outweighed benefits, and even the targeted A428 upgrade carries a price tag of around £1 billion+.

Environment and land: Carving a full motorway through countryside, villages, and historic areas around Cambridge brings heavy land-take, carbon, and environmental impacts.

Induced traffic: Wider, faster roads often attract extra car trips over time, which can ease congestion only temporarily unless paired with rail and bus alternatives like East West Rail.

The New A421 Dual Carriageway Between Black Cat And Caxton Gibbet

This map from National Highways  shows the A428 (Black Cat to Caxton Gibbet) dual carriageway.

Note.

  1. The orange road is the new dual carriageway section.
  2. The new section will be 10 miles long.
  3. There is a new bridge over the East Coast Main Line.
  4. There will be a 240-metre viaduct over the River Great Ouse.

This Google Map shows between Bedford and Caxton Gibbet.

Note.

  1. Bedford is in the South-West corner of the map.
  2. The Caxton Gibbet roundabout is indicated by the red arrow.The Black Cat roundabout is South of Wyboston on the A1 road.
  3. The scar of the new A421 road can be traced between the two roundabouts.
  4. The A421 crosses over the A1 at the Black Cat roundabout and then goes North of Great Barford and South of Bedford, on its way to Junction 13 of the M1 and Milton Keynes.

This second Google Map shows between the Black Cat and Caxton Gibbet roundabouts.

Note.

  1. The Black Cat roundabout is indicated by the red arrow.
  2. The Caxton Gibbet roundabout is in the North-East corner of the map.
  3. The scar of the new A421 road can be traced between the two roundabouts.
  4. The A1 runs down the left margin of the map
  5. The A421 crosses over the A1 at the Black Cat roundabout

This third Google Map shows between the Black Cat roundabout, to a larger scale.

Note.

  1. The Black Cat roundabout is indicated by the red arrow.
  2. The incomplete A421 runs across the map from West to East.
  3. The A421 crosses over the A1 at the Black Cat roundabout.
  4. At the Western edge of the map, the A421 goes North of Great Barford and South of Bedford, on its way to Junction 13 of the M1 and Milton Keynes.
  5. In the middle of the map, the River Great Ouse runs across the map from North to South.
  6. At the far right of the map, the East Coast Main Line runs across the map from North to South.
  7. Off the map at the right, the A421 turns North and then East to Caxton Gibbet, Cambourne, Cambridge and the East.

This fourth Google Map shows between the Caxton Gibbet roundabout, to the same scale as the previous map.

It must be the only gibbet in the world with a kebab shop.

I have done the journey between Bedford and/or Milton Keynes, and Suffolk many times and this new A421 dual carriageway will make a lot of difference.

But I do wonder, if the new road, will encourage travellers to favour road over rail.

Perhaps when this major gap in the road network is in place, it could be used to create a virtual railway to the East of Bletchley and Milton Keynes.

 

 

 

 

 

 

 

Note.

 

November 29, 2026 Posted by | Artificial Intelligence, Transport/Travel | , , , , , , , , , , , , , , , , , | Leave a comment