The Anonymous Widower

Extra Track Up The Lea Valley

Yesterday, Network Rail released this document on their web site, which is entitled Extra track to be installed in Lee Valley this autumn for a bigger and better railway.

This is the opening sentence.

Work to build a new track between Stratford and Angel Road is being stepped up this autumn as part of the £170m Lee Valley Rail Programme to increase services and boost local regeneration.

Network Rail will carry out the following work as part of its Railway Upgrade Plan:

  • Strengthening the River Lea rail bridge near Tottenham Hale to support the new third track
  • Installing foundations for the new overhead line structures to provide power for trains using the third track
  • Installing foundations for the new island platform and footbridge at Tottenham Hale station to help people move around the station easier
  • Installing foundations for a new island platform at Northumberland Park to allow access to trains that will use the new track
  • To make the most of the closure, track will also be renewed near Lea Bridge station as part of the track renewals programme

It certainly makes my pictures clearer.

I took these pictures yesterday.

Note.

  1. The current platform 1 at Tottenham Hale station will be turned into an island platform.
  2. It will be tight to squeeze everything in at Tottenham Hale.
  3. It looks like the space for the track between Tottenham Hale and Angel Road stations has been cleared.
  4. The current platform 1 at Northumberland Park station will be turned into an island platform.
  5. The level crossing at Northumberland Park station has been closed.

It would appear a good start has been made.

This Google Map shows the footbridge that goes over the tracks and the Victoria Line Depot.

Note that when it comes to squeezing in a fourth track, there is more space than first appears.

 

August 2, 2017 - Posted by | Transport | , , , ,

2 Comments »

  1. which begs the question, why don’t they just fit the fourth track in now …

    Comment by PJS | August 3, 2017 | Reply

    • I have a feeling that before they can put in the fourth trak, they will need to replace the level crossings at Brimsdown and Enfield Lock.

      The bridge at Tottenham Hale looks very tight and this might need to be replaced.

      Comment by AnonW | August 3, 2017 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.