When I wrote Will London Overground Fit On-board Energy Storage To Class 378 Trains? in March, I didn’t look very hard at Southern’s collection of over two hundred Class 377 trains, of which forty-six are dual-voltage units.

I then read this article on the Railway Technical web site, which is entitled Southern’s 377/6 takes shape in Litchurch Lane. This is said in the article.

Regenerative braking capability was provided on the trains from the beginning but it was not used.

Things have improved in the last few years and some parts of the network can accept returned power, but the article adds this caveat.

If the train detects that the line is unable to take the extra voltage, the regenerated power is dumped into an on-board resistor grid.

So it would appear that the Class 377 trains could benefit from the addition of on-board energy storage.

How much of the electricity bill it would save, is I suspect known to the accountants and it should be a fairly simple analysis to see if on-board energy storage were to be fitted all or some of Class 377 trains.

But converting a small number of trains, would give Southern a train capable of replacing the Class 171 trains on London Bridge to Uckfield and the Marshlink Line.

Class 377 trains with an IPEMU capability on these routes might give operational benefits.

  • London to East Grinstead is already run by Class 377 trains. So the same trains could be used on both branches, which must be a benefit for the operator, in terms of driver and staff training.
  • Class 377 trains already run to the end of the electrification at Ore from Brighton, Eastbourne and Cannon Street, so it might be advantageous for both operator and passengers to continue some or all of these services to Ashford.
  • Rye and the other stations on the Marshlink Line would get a direct electric service to London.

The only problem is that Hastings wouldn’t get a high-speed service to St. Pancras.

April 3, 2016 - Posted by | Transport/Travel | , , , ,

1 Comment »

  1. […] But after writing Are The TOCs Arguing Over The Class 387 Trains?, and getting a tip-off (Thank you! John!) , I took a look at the closely related  Class 377 trains and wrote Will Southern Fit On-board Energy Storage To Class 377 Trains? […]

    Pingback by The Uckfield Branch Is Almost Ready For Longer Trains « The Anonymous Widower | April 3, 2016 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: