The Anonymous Widower

Could Platforms 1 And 2 At Manchester Piccadilly Station Become A Tram-Train Terminal?

Tram-trains often pass through a city in the following manner.

  • They arrive in the city as trains and take to the tram system.
  • They use the tram system to go through the city centre,
  • At the other side of the city, they take to the rail lines and go to the final destination.

I took this picture in the main square in Kassel in Germany.

A continuous stream of trams and tram-trains pass through going across the city.

Isn’t it just like Piccadilly Gardens in Manchester? except that at present, they’re all trams on the Manchester Metrolink!

In Manchester Metrolink Extensions In A Sentence, I gave this quote from the Manchester Evening News.

It includes tram extensions to Port Salford, Middleton and Stalybridge, plus ‘tram trains’ to Hale, Warrington, Gorton and Glossop.

Currently, services to Hale, Gorton, Glossop and other places like Guide Bridge, Marple and New Mills Central come into low-numbered platforms in Manchester Piccadilly station.

The original plans for High Speed Two were rather unimaginative and probably very expensive, envisaged four High Speed platforms on the Northern side of the station.

In Changes Signalled For HS2 Route In North, I analyse the latest thinking on High Speed Two and I believe there is a chance, that Manchester Piccadilly will have underground through platforms deep underneath the current station.

These pictures show platforms 1 and 2 at Piccadilly station.

Currently, several of the lines that terminate in these two platforms are run by life-expired Pacers and they will be replaced by Class 195 trains.

But, as the quoted sentence shows, some of the routes into these platforms could be turned over to tram-train operation.

In Manchester Metrolink To Gorton And Glossop, I showed how it might be possible to connect the tram stop under Piccadilly station to the Glossop Line.

On the other hand the tram-trains might be able to run into these two platforms.

Conclusion

If Manchester acquires a few tram-trains, their rail and tram networks would appear to have lots of opportunities to use them efficiently.

It does also look, that it would be very advantageous, if the High Speed platforms could be through platforms underneath the main station.

  • Two well-designed through platforms would be able to handle a lot of trains and passengers.
  • The station could be refurbished, rather than demolished and rebuilt.
  • Fewer new platforms would be needed.

But above all updating the station would have a lower cost and would cause less disruption to all users.

 

 

 

August 14, 2019 - Posted by | Transport | , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.